JUST HOW TO INSTALL A BATHTUB: SET UP AN ACRYLIC BATHTUB AND BATHTUB SURROUND

Just How to Install a Bathtub: Set Up an Acrylic Bathtub and Bathtub Surround

Just How to Install a Bathtub: Set Up an Acrylic Bathtub and Bathtub Surround

Blog Article

Schedule Free Estimate

Here below you can get additional dependable help and advice in regards to How to Install a Bathtub: Install an Acrylic Tub and Tub Surround.


How to Install a Bathtub
Setting up a tub isn't specifically brain surgery, but it does require solid plumbing, woodworking, and also sometimes, tiling skills. Changing an old bath tub with a brand-new one is additionally a moderately challenging job. If the old bathtub is conveniently accessible, the project can move immediately; if you need to open up a wall surface to remove the old tub as well as place the brand-new bath tub, the job is much harder. In either case, the job is within a house handyman's abilities, although you will certainly require an assistant to move out the old tub and set in the new one. Make certain you have actually certified yourself for the task as well as fit trying it. As opposed to working with a service provider to take control of a halfway-completed project, it is better to consider employing one before you begin. Chances are you may need a professional plumber to make tube connections.
This article will help you install a new tub in your restroom if you have already purchased a new tub and don't need to transform the setup of your previous water pipelines.
Your devices and also product list must make up the following:
  • New Tub
  • Hammer

  • Pipe Wrenches

  • Prybar

  • Safety Glasses

  • Degree

  • Pliers

  • Adjustable Wrench

  • Putty Knife

  • Screwdriver

  • Cold Chisel

  • Tape Measure

  • Pipeline Caps


  • Planning for the Installation


    First of all, the supporting frame supplied with the bath should be fitted (if required) according to the producer's instructions. Next, fit the taps or mixer to the bathtub. When suitable the faucet block, it is necessary to see to it that if the faucet includes a plastic washer, it is fitted between the bath and the taps. On a plastic bathroom, it is additionally reasonable to fit a sustaining plate under the taps unit to prevent strain on the bath tub.
    Fit the adaptable faucet ports to the bottom of the two taps using 2 nuts and also olives (occasionally provided with the tub). Fit the plug-hole outlet by smearing mastic filler round the sink outlet opening, and afterwards pass the electrical outlet with the hole in the bath. Make use of the nut provided by the maker to fit the plug-hole. Analyze the plug-hole electrical outlet for an inlet on the side for the overflow pipeline.
    Next, fit the end of the adaptable overflow pipeline to the overflow outlet. After that, screw the pipeline to the overflow face which must be fitted inside the bath. Make sure you make use of every one of the supplied washing machines.
    Connect the catch to the bottom of the waste outlet on the bath tub by winding the thread of the waste electrical outlet with silicone mastic or PTFE tape, as well as screw on the catch to the electrical outlet. Link all-time low of the overflow tube in a similar manner.The bathroom must now prepare to be fitted in its last position.

    Removing Old Touches


    If you need to change old taps with brand-new ones as a part of your installation, after that the first thing you should do is disconnect the water system. After doing so, turn on the faucets to drain any type of water remaining in the system. The procedure of removing the existing taps can be fairly troublesome as a result of the restricted gain access to that is often the situation.
    Make use of a basin wrench (crowsfoot spanner) or a faucet tool to reverse the nut that attaches the supply pipes to the faucets. Have a cloth prepared for the continuing to be water that will originate from the pipelines. When the supply pipelines have been eliminated, make use of the same device to loosen up the nut that holds the taps onto the bath/basin. You will certainly require to stop the single faucets from transforming during this procedure. As soon as the taps have been eliminated, the holes in the bath/basin will certainly have to be cleaned up of any kind of old sealing compound.
    Prior to moving on to fit the new taps, contrast the pipeline connections on the old taps to the brand-new faucets. If the old taps are longer than the new taps, after that a shank adapter is needed for the new taps to fit.

    Setting up the Tub


    Utilizing both wooden boards under its feet, put the bath tub in the required setting. The wood boards are useful in uniformly spreading out the weight of the bathtub over the area of the boards rather than concentrating all the weight onto four little factors.
    The following goal is to make sure that the bathtub is leveled all round. This can be accomplished by examining the level and changing the feet on the bath tub till the spirit level checks out degree.
    To mount taps, fit the bottom of the furthest versatile faucet connector to the suitable supply pipe by making a compression sign up with; after that do the same for the various other faucet.
    Switch on the water supply and check all joints and new pipework for leaks and tighten them if required. Fill up the tub as well as additionally examine the overflow electrical outlet and also the regular electrical outlet for leakages.
    Ultimately, deal with the bathroom paneling as explained in the maker's instruction manual. Tiling as well as sealing around the bathtub ought to wait until the bathtub has been made use of at the very least when as this will certainly resolve it into its final position.

    Fitting New Touches


    If the tails of the new taps are plastic, then you will need a plastic port to avoid damage to the thread. One end of the port fits on the plastic tail of the tap as well as the other end offers a connection to the existent supply pipes.
    If you need to fit a monobloc, then you will certainly call for lowering couplers, which attaches the 10mm pipeline of the monobloc to the typical 15mm supply pipeline.
    Next off, position the faucet in the mounting hole in the bath/basin ensuring that the washers remain in area in between the faucet as well as the sink. Protect the tap in place with the manufacturer provided backnut. As soon as the faucet is safely in place, the supply pipes can be connected to the tails of the faucets. The faucets can either be linked by using corrugated copper piping or with normal tap adapters. The previous type ought to be connected to the faucet finishes first, tightening only by hand. The supply pipelines can later on be linked to the other end. Tighten up both ends with a spanner after both ends have actually been linked.

    Tiling Around the Bathtub


    In the location where the bathroom satisfies the tile, it is essential to secure the joins with a silicone rubber caulking. This is important as the installation can relocate enough to crack an inflexible seal, triggering the water to penetrate the wall surface in between the bath and the tiling, bring about issues with dampness and also feasible leaks to the ceiling listed below.
    You can select from a selection of coloured sealers to blend in your components as well as fittings. They are marketed in tubes as well as cartridges, and can sealing voids as much as a width of 3mm (1/8 inch). If you have a bigger gap to load, you can fill it with spins of drenched newspaper or soft rope. Bear in mind to always load the tub with water prior to securing, to allow for the activity experienced when the tub remains in use. The sealer can break rather early if you do not take into account this motion prior to sealing.
    Conversely, ceramic coving or quadrant ceramic tiles can be used to edge the bathroom or shower tray. Plastic strips of coving, which are easy to use as well as reduce to size, are additionally quickly readily available on the market. It is suggested to fit the tiles making use of water-resistant or water-proof adhesive as well as cement.

    A Step-by-Step Guide to Installing a Bathtub


    Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.



    But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.



    This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.


    Remove the Existing Bathtub


    To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.



    The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.


    Choose the Right Bathtub


    The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.


    Install the Plumbing and Ledger Board


    You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.



    Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.


    Install the Bathtub


    When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.



    Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.



    If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.


    Hook up the Plumbing


    Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.


    Install the Bathtub Surround


    A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.



    Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.



    If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.



    If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

    https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


    How to Install a Bathtub: Install an Acrylic Tub and Tub Surround

    Hopefully you enjoyed reading our topic on A Step-by-Step Guide to Installing a Bathtub. Many thanks for taking a few minutes to browse our posting. Are you aware of somebody who is fascinated by the topic? Feel free to share it. Thank you for taking the time to read it.




    Get A Free Estimate


    Report this page